Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 21, 2019     8-5 step 1-2 HS Spar Caps final drill - (2 hours) Category: Tail Feathers
Nested spar caps to spar, measure distance, mark and cleco in position with additional clamps.
Final drill the 1/8"" holes in the spar web into the entire length with #30 drill.
Disassembled, deburred, removed chips on all sides and holes.
Reassembled in position
Same procedure for the other spar cap.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.